Project Name: Piedmont Park Church Renovations Location: Thomasville Road, Tallahassee
The WestScott Construction team hit the ground running on one of its latest remodeling and renovation projects. After working out the particulars with the folks at Piedmont Park Church on Thomasville Road, the team removed the existing sanctuary stage stairs and a portion of the existing acoustical ceiling tiles, and lighting.
After that, the heavy lifting for this project had begun. A backstage area was constructed along with a brand new baptismal pool.
WestScott team successfully accomplished:
Removal of Existing Stage, Stairs and Kneelers
Removal of Acoustical Tile Ceiling and Lighting
Constructed:
New Back-Stage and Baptismal Pool
New Elevated Stage of Metal Stud Frame With Oak Stairs and New Kneelers
Sheetrock and Decorative Trim Mouldings
Installed:
New Faux Faux Stack Stone Panels
New Acoustical Wall Panels
New Electrical System
Acoustic Grid and Panels
New Updated Stage Lighting
New Electrical Outlets and Audio Boxes in Stage Deck Area
Encased 2nd Floor Handrails with 42” Knee Wall
The experienced team at WestScott Construction has an extensive resumé of satisfied clients of the cloth; whether a Synagogue or Church, approaching each project with efficiency, reverence and respect is the WestScott way. Check out some of the past projects here: projects/
Installation of all-new electrical, stage lighting, and new acoustical grid panels.The Piedmont renovation is in progress from the WestScott point of view. Construction of the new white oak stairs and kneelers.